Proposed decision by CPUC judge authorizes a SBC surcharge to recover costs of undergounding phone lines
Date of Filing/Decision
STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor
PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 October 30, 2006 Agenda ID #6123 Ratesetting TO PARTIES OF RECORD IN APPLICATION 05-03-005 This is the proposed decision of Administrative Law Judge (ALJ) Bushey. It will not appear on the Commission’s agenda for at least 30 days after the date it is mailed. The Commission may act then, or it may postpone action until later. When the Commission acts on the proposed decision, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare its own decision. Only when the Commission acts does the decision become binding on the parties. Parties to the proceeding may file comments on the proposed decision as provided in Article 14 of the Commission’s /s/ ANGELA K. MINKIN Angela K. Minkin, Chief Administrative Law Judge ANG:tcg Attachment F I L E D 10-30-06 03:51 PM Ratesetting Decision PROPOSED DECISION OF ALJ BUSHEY (Mailed 10/30/2006) BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA In the Matter of the Application of SBC California (U 1001 C) for a Surcharge and a Balancing Account to Recover Undergrounding Costs in the City of San Diego. Application 05-03-005 (Filed March 3, 2005) OPINION AUTHORIZING MODIFIED SURCHARGE TO RECOVER COSTS OF UNDERGROUNDING AERIAL TELEPHONE LINES I. Summary In this decision, we grant the request of Pacific Bell Telephone Company, doing business as SBC California (SBC)1 for a surcharge to recover the costs of undergrounding its aerial telephone lines in San Diego. We modify SBC’s proposed rate design for the surcharge from a fixed amount to a percentage of all intrastate revenue. II. Background In January 2001, the City of San Diego (City) adopted its Underground Utilities Procedural Ordinance to provide for the expedited undergrounding of overhead utility wires within the city limits. The City’s goal is to underground all currently overhead utility lines in 20 years. To accomplish this goal, the City must quadruple the current rate at which utility lines are undergrounded. 1 Now known as AT&T California, Inc. This Commission has adopted comprehensive, statewide rules that govern when and where a utility may remove overhead lines and replace them with underground service, and whether such costs will be recovered through rates. These rules are set forth in Tariff Rule 32 for SBC and Tariff Rule 20 for San Diego Gas and Electric Company (SDG&E). To accommodate the City’s ordinance, SDG&E sought Commission authorization to deviate from Tariff Rule 20. In Resolution E-3788, the Commission granted both SDG&E and SBC permission to deviate from their respective tariffs and comply with the City’s ordinance. To finance SDG&E’s portion of the undergrounding project, the City and SDG&E entered into an agreement whereby the franchise fee SDG&E pays to the City would increase from 1.9% of gross revenues to 5.78%. Ninety percent of the increased funds would be used by the City to pay for the undergrounding. The Commission also authorized SDG&E to increase the City’s franchise fee surcharge to all City customers to reflect the increased fee, and directed SBC to file an application to seek permission to recover its increased undergrounding costs from City customers. On March 3, 2005, SBC filed this application to approve a surcharge and balancing account to track and recover its costs for the City undergrounding project. SBC estimated that the total cost of the San Diego undergrounding project would be $125 million and that the project would extend over 17 years. SBC requested an initial surcharge of $0.94 per customer line per month, to be adjusted annually via the balancing account. On April 7, 2005, the Utility Consumers’ Action Network (UCAN) protested the application, arguing that undergrounding costs are before the Commission in the undergrounding rulemaking (Rulemaking 00-01-005). UCAN On April 18, 2005, the Division of Ratepayer Advocates (DRA) filed a motion requesting permission to late-file its protest to this application, which was granted on May 3, 2005. DRA also challenged the requested relief as violating New Regulatory Framework principles. Telscape Communications, Inc. (Telscape), XO Communications, Inc., Power Communications Corp., and the California Association of Competitive Telephone Companies also protested the application. DRA and a coalition of the competitive carriers filed motions to dismiss the application, contending that it violated both federal law and the New Regulatory Framework under which this Commission regulates SBC. SBC and the City opposed the motions. On May 24, 2005, the assigned Administrative Law Judge (ALJ) convened a prehearing conference and set a procedural schedule to resolve the motions to dismiss. The Commission denied the motions to dismiss in Decision (D.) 05-10-028. The assigned ALJ convened a second prehearing conference on December 5, 2005, and set a procedural schedule to address the merits of the application. After completing discovery, the parties distributed written direct testimony. Evidentiary hearings were held on May 15 and 16, 2006. The parties filed opening briefs on June 16, 2006, and the proceeding was submitted for Commission consideration with the filing of closing briefs on July 7, 2006. III. Positions of the Parties A. SBC SBC proposed a flat fee rate design for its surcharge to recover the cost of the San Diego undergrounding project. SBC calculated the fixed amount surcharge per customer line by dividing the total annual forecasted cost by the average number of access lines in service in San Diego, 657,000 lines. (This amount includes all lines served by SBC and other local exchange carriers.) The result is the annual amount which must be recovered from each access line. The monthly surcharge per line is determined by dividing the annual total by 12, which SBC calculated to be $0.77 for 2007 and $1.51 for 2008. The remaining years showed a forecasted surcharge of about $0.90 per month per line. SBC proposed to apply this surcharge to all customer access lines it serves directly, as well as all lines SBC provides to competitive local exchange carriers for resale to San Diego end users. SBC did not exempt from the surcharge low-income customers eligible for discounted local exchange service in the Lifeline program. SBC stated it had no information on the number of low-income program participants taking service from the competitive local exchange carriers, and thus no practical way to reflect any such customer exemptions in calculating the surcharge. Because it could not exempt competitive local exchange carriers’ low-income customers, SBC did not propose to exempt its low-income customers from the surcharge. The City supported SBC’s proposal. B. UCAN UCAN contended that SBC’s proposal was anti-consumer and anticompetitive. UCAN stated that SBC’s fixed monthly fee proposal was regressive because it would disproportionately impact low- and fixed-income customers, who often have few competitive choices. In contrast, the benefits of undergrounding will accrue disproportionately to homeowners, as property values rise due to improved appearance. UCAN further contended that SBC would be able to cross-subsidize its competitive service offerings by recovering the cost of network enhancements through the undergrounding surcharge on regulated services. C. Telscape Telscape opposed SBC’s proposal to assess the undergrounding surcharge on Lifeline customers. Telscape explained that SBC’s surcharge would amount to a 20% increase in Lifeline rates for local residential service, with no offsetting benefits. Telscape recommended that Lifeline customers be exempt from the surcharge and that the City should make up the shortfall in undergrounding costs. Telscape also asked that the Commission modify SBC’s surcharge by excluding costs where SBC is installing additional capacity, apportion costs to the unused capacity, allocate costs based on use of the system, require pro-rating of the surcharge for partial months, and allow for chargeback of any uncollectible surcharge revenues. D. XO Communications Services, Inc. XO also opposed SBC’s application and argued that “the Commission’s jurisdiction and authority are being eroded and undermined by the City’s attempt to force [SBC] to act as its collection agent to recover the costs of the undergrounding program.” Specifically, XO contended that the Commission has set up a statewide program for undergrounding, balancing the costs and benefits. Granting SBC’s requested surcharge would encourage other cities to by-pass the Commission’s program, adopt similar ordinances, and expect the Commission to order surcharges to recover the costs. Furthermore, XO continued, Commission approved Lifeline rates will be increased by approximately 30% due to the undergrounding surcharge, in derogation of the Commission’s determination of the appropriate rate for low-income customers. XO concluded that SBC’s proposal was also anticompetitive because certain of SBC’s customers that take service pursuant to contracts, rather than tariffs, will not be assessed the surcharge. XO also stated that SBC was already recovering the costs of undergrounding through its existing rates, as approved by this Commission in the New Regulatory Framework, and in the setting of prices for unbundled network elements, which are purchased by competitive local carriers, such as XO. The surcharge represents a double-counting of these costs. Finally, the detailed auditing necessary to ensure that SBC does not improperly charge unrelated costs to the surcharge balancing account is impractical due to expense and oversight needed. E. Division of Ratepayer Advocates DRA opposed the surcharge as being inconsistent with the New Regulatory Framework which set SBC’s prices to include the cost of undergrounding. DRA also opposed the notion of a fixed or per line surcharge as being unprecedented at this Commission, and advocated that Lifeline program participants be exempt from the surcharge. If the Commission were to adopt a surcharge, DRA recommended that it be proportionally assessed to all SBC customers based on total purchases from SBC and all its affiliates. DRA’s proposed to allocate costs between Commission jurisdictional services and other services, e.g., based on total billed amounts in San Diego. The surcharge on jurisdictional services would be set to recover a share of total undergrounding costs calculated by the proportion of jurisdictional sales in San Diego to total sales. SBC would have discretion to recover the remaining costs, i.e., the nonjurisdictional fraction, from its nonjurisdictional customers. DRA pointed to the Commission’s Reimbursement Fee, which applies a surcharge of 0.11% to all jurisdictional revenue, as an example of the surcharges on which its proposal was modeled. Finally, DRA objected to SBC’s cost forecasts as being “far higher than publicly available data of actual expenditures.” DRA supported a monitoringand audit program equivalent to that applied to SDG&E.” IV. Discussion The applicant, SBC, bears the burden of proving that its proposed surcharge is “justified.” Pursuant to Pub. Util. Code § 454(a), prior to implementing the surcharge, SBC must make a “showing before the Commission,” and, based on that showing, the Commission must find that the surcharge is “justified.” As discussed in detail below, we find SBC’s showing on the forecasted costs to be scant; we therefore adopt limitations and oversight modeled on those applied to SDG&E. We find SBC’s showing failed to justify its proposed rate design. Consistent with our precedent for other similar public policy surcharges, we will require that SBC assess the surcharge as a percentage of intrastate revenue. Prior to considering the specifics of SBC’s proposal, however, we address the issue of our statewide plan for undergrounding utility lines and future applications similar to SBC’s. A. The Commission’s Undergrounding Program As discussed above, the Commission has adopted a long-standing program to determine an undergrounding program, in concert with the affected electric and telephone utilities. In Rulemaking 00-01-005, the Commission acted on Legislative directive (AB 1149) by studying ways to amend, revise, and improve rules for the conversion of existing overhead electric and communications lines to underground. The legislation required that the Commission study ways to: 1) eliminate barriers to undergrounding and to prevent uneven patches of overhead facilities; 2) enhance public safety; 3)improve reliability; and 4) provide more flexibility and control to local governments. The Commission issued an interim decision in that proceeding, D.01-12-009, which expanded the use of the existing program, and set several contentious issues for a subsequent Phase 2. That Phase has not yet been completed. The parties in this proceeding raised policy issues regarding the wisdom of the Commission allowing its general ratemaking authority to be used by the City as a mechanism to collect the costs of undergrounding utility lines. Undergrounding utility lines is extremely expensive. With the proposed surcharge, San Diego residents will be paying an extra $4 per month in utility charges ($3 to SDG&E and $1 to SBC), on top of any other price increases. The Commission has historically shouldered the burden of balancing the costs of undergrounding with the benefits in adopting uniform statewide policies. With today’s decision and Resolution E-3788, this Commission has allowed the City to effectively short-circuit the long-standing plan. Extraordinary and unique events led to today’s decision. Most significantly, the SDG&E franchise fee increase has been in place for some time and actual work on this project has commenced. On balance, the totality of the circumstances supports going forward with this surcharge despite its inconsistency with the statewide plan. We direct our staff to advise any utilities seeking such measures, either as surcharges or increases in franchise fees, that the statewide plan controls utility undergrounding. B. Cost Forecasts SBC provided no forecasts based on its actual costs in support of its proposed surcharge. Instead, SBC witness Kieren derived SBC’s cost forecast from SDG&E’s forecast of its cost to underground its facilities in the same areas. SDG&E estimated $28.3 million for 2007, $51.8 million for 2008, and $31 million for each year thereafter until 2023. SBC multiplied SDG&E’s annual amount by 0.23, which is the historical ratio of SBC’s to SDG&E’s costs. SBC’s annual amount was then divided by 657,000 lines, which is the current average number of access lines in service in San Diego. Finally, the result was divided by 12 to arrive at a forecasted monthly per line surcharge. SBC proposed to use a balancing account to track actual labor and expense costs associated with undergrounding and to adjust the surcharge up or down as In short, SBC’s surcharge proposal, which is contemplated to collect over $125 million, is derived from three numbers obtained from SDG&E – cost estimates for 2007, 2008, and $31 million for each year thereafter. Other than elementary mathematical manipulation, SBC added nothing to SDG&E’s forecasts. SBC, however, is not in any way bound to the cost forecasts. SBC proposed to recover its actual costs over the 17-year project by recording those costs in a balancing account and then setting the surcharge to recover that amount. After setting the initial surcharge, which will be subject to true up to actuals, the cost forecasts will be irrelevant. Accordingly, the key elements of SBC’s proposal are the recording of actual costs and the balancing account to ensure full recovery. These two elements work together to allow SBC a direct path from recorded costs to customers’ bills. SBC proposes to send an annual report to the Director of the Commission’s Telecommunications Division to “allow the Commission to track and validate the cost associated with the project and the correctness of the surcharge amount.” XO witness Knowles was skeptical that SBC’s promised annual reports would be sufficient to allow the type of detailed auditing required for this $125 million, 17-year project. Knowles testified that SBC could be tempted to load up the undergrounding surcharge account “with all manner of oversight, management, supervision, systems development and general costs.” Annual reports with very little detail will not be sufficient to thwart this temptation. We agree. SBC’s proposed virtually no oversight of costs that might be recorded in the balancing account, and the surcharge will enable SBC to recover the recorded amounts directly from customers. Detailed auditing and oversight, however, would require a commitment of significant Commission and SBC resources. As an alternative, we find that the historic ratio of SBC’s and SDG&E’s undergrounding costs provides a convenient point of reference for valuating future costs. To the extent SBC’s future costs exceed this historic ratio, we will impose enhanced oversight obligations on SBC. If, as XO fears, SBC allocates unrelated costs to the San Diego undergrounding project, then SBC’s costs would be expected to exceed 23% of SDG&E’s. Such an increase would be a signal to the Commission, and the parties, that greater scrutiny of the cost allocations is required. On the other hand, if the historical ratio remains stable in the future, then the Commission would have some evidence that SBC is not allocating unrelated costs to the San Diego undergrounding program. Therefore, to the extent SBC’s costs do not exceed 23% of SDG&E’s costs in any calendar year, SBC will be required to submit a semi-annual report to the Telecommunications Division Director showing the status of the project, items recorded in the balancing account, and surcharge calculations. Supporting detail should also be available. SBC’s semi-annual reports shall be filed contemporaneously with SDG&E’s similar reports to the Energy Division. Each report shall show the ratio between SBC’s and SDG&E’s costs. The surcharge shall be recalculated annually via advice letter filing, with supporting workpapers. Finally, in D.05-10-028, we directed the assigned Commissioner and ALJ to manage this proceeding to ensure that a full factual and legal record was created for our consideration on the issue of whether the undergrounding costs were included in SBC’s New Regulatory Framework and network element revenue requirements. Allowing the same costs to be used as a basis for the surcharge would result in double-counting. SBC’s witness explained that SBC’s undergrounding projects in San Diego which occur pursuant to SBC’s tariff Rule 32 program will be segregated from the undergrounding projects required by the City’s ordinance. SBC witness McDaniel testified that SBC will underground lines in San Diego simultaneously under both the tariff rule 32 program and as required by the City’s ordinance. Because the tariff rule 32 program requires detailed cost accounting, SBC will be required to separately record and track the costs associated with each program. This explanation, coupled with the auditing requirement imposed above, is sufficient to resolve the issue from our earlier decision. In conclusion, we will authorize SBC to establish a San Diego Utilities Underground Utilities Procedural Ordinance balancing account, and to record costs associated with undergrounding aerial telephone lines pursuant to that ordinance in the account. 3 Such an audit may be performed by Commission auditors or out side vendors as deemed appropriate by the Director of the Telecommunications Division. C. Applicability of the Surcharge As analyzed below, our precedent requires that public policy surcharges, such as this, be applied to the widest possible customer base and that SBC has not presented a persuasive justification for excluding certain contracts from the surcharge. Similarly, end users served by wholesale customers also should be subject to the surcharge. Based on our precedent, we do, however, exclude Lifeline service from the surcharge.XO witness Knowles objected to SBC’s plan to impose the proposed surcharge on lines served pursuant to certain The Public Utilities Code requires that SBC justify its proposal to exclude customers from the surcharge. SBC’s evidence on this point is limited to an assertion that customers will not be included where the “contract does not allow the surcharge to be applied.” SBC has not provided for the record copies of any such contractual language, estimates of the numbers of lines to which this exemption would apply, nor any calculation of amount by which the surcharge will be increased to reflect these exemptions. Our long-standing goal is to apply public policy surcharges to “the widest possible customer base.” See, e.g., UCAN and DRA oppose SBC’s proposal to apply its surcharge to all residential service lines participating in the Lifeline program. UCAN and DRA contend that this proposal is regressive and that SBC’s rationale is not persuasive. SBC concedes that it could easily exempt its own Lifeline customers from the surcharge. However, no means has been proposed or developed to exempt the Lifeline customers of the competitive local carriers from the surcharge. SBC concludes that, therefore, all Lifeline customers must be included in the surcharge. We disagree. As discussed in more detail below, the Commission has created a number of public purpose programs which are funded by a surcharge on intrastate revenue. Lifeline service6 is exempt from these surcharges. See ReAlternative Regulatory Frameworks for Local Exchange Carriers, 56 CPUC 2d 117, 266 (D.94-09-065). The same methodology and process used for assessing these surcharges, and exempting Lifeline service, should be applied to the San Diego undergrounding surcharge. In this way, all Lifeline service, whether provided by SBC or a competitive local carrier, will be exempt from the surcharge. A similar result occurs with regard to Telscape’s and XO’s continuing objection to applying the surcharge to services provided by competitive local exchange carriers. These carriers calculate and collect the surcharges listed below from their customers. This same process should be applied for the San Diego undergrounding surcharge. 4 1FR, 1MR, 1MB, Centrex, ISDN Basic, Business Lines and Trunks, California 900, Direct Connection, FEX Lines, FPS Lines, PSP/COPT, ISDN PRI, PBX (Retail and Resale classes), Residence (Flat, Measured, ADL, and Lifeline) and SDS56. 5 SBC’s rebuttal testimony suggests that customers taking service pursuant to Local Wholesale Complete, Individual Case Basis, Express, and Government contracts may be exempted from the surcharge if contract “does not allow the surcharge to be applied.” 6 Any additional services purchased by the Lifeline customer are subject to the surcharge. D. Rate Design of Surcharge SBC stated that a flat rate surcharge more appropriately reflects the costs and benefits of undergrounding aerial telephone lines. The costs are driven by the number of wire pairs that must be placed underground. Each pair costs the same to underground regardless of the amount of telephone services provided over the line. The benefits of undergrounding, which the City describes as primarily aesthetic, are shared equally by each resident, again regardless of the amount of telephone services provided. As set out above, UCAN and DRA objected to the fixed amount surcharge as being regressive and unprecedented by this Commission. SBC did not challenge the “regressive” characterization, but in its reply brief did cite to two Commission-approved fixed amount surcharges. The cited surcharges – one cent per year for number portability surcharge and 25 cents per month for payphones – are both The surcharge SBC proposes requires just such a broad based public service funding method. The Commission’s typical rate design for this type of surcharge is a percentage of intrastate revenue. The Commission has adopted surcharges on intrastate revenues for the following public policy programs: Program Surcharge Purpose Lifeline 1.29% Provide reduced rate service to lowincome customers California Relay Service and Communications Devices Fund 0.27% Provide equipment and relay service to deaf and disabled customers CPUC User Fee 0.11% Provide funding for Commission operations High Cost Fund A 0.21% Provide subsidy for geographically expensive areas (small carriers) High Cost Fund B 2.00% Provide subsidy for geographically expensive areas (large carriers) California Teleconnect Fund 0.13% Provide discounted telecommunications service toschools, libraries, and medical clinics Each competitive and incumbent local exchange carrier in California must assess these surcharges on all intrastate revenues, and remit the collected funds to the Commission. See, e.g., Application of Transcend Multimedia, LLC for a Certificate of Public Convenience and Necessity to Operate as a Provider of Resold Local Exchange Telecommunications Service Within the State of California, D.06-07-009 (July 20, 2006). SBC has provided us no persuasive rationale for deviating from this longstanding surcharge rate design. Similarly, DRA has not provided compelling rationale to allocate to services beyond our jurisdiction a fraction of the amount to be collected. Accordingly, we will modify the rate design of SBC’s surcharge proposal to a percentage of intrastate revenue. In conclusion, we will authorize SBC to assess the City of San Diego Surcharge for Underground Conversion Costs on the intrastate revenues from all San Diego customers, with the exception of Lifeline service. The surcharge shall be calculated annually, and SBC shall file an advice letter setting forth its calculations with supporting documentation. V. Assignment of Proceeding Michael R. Peevey is the Assigned Commissioner and Maribeth A. Bushey is the assigned ALJ in this proceeding. VI. Comments on Proposed Decision The proposed decision of the ALJ in this matter was mailed to the parties in accordance with Pub. Util. Code § 311 and Rule 14.2(a) of the Rules of Practice and Procedure. Comments were filed on __________. Findings of Fact 1. SBC did not prepare its own cost forecasts for the San Diego undergrounding project but rather relied on the historical ratio of its and SDG&E’s undergrounding costs, 23%, and SDG&E’s costs forecasts as the basis for its application. 2. The Commission has adopted a long-standing, detailed, and comprehensive program for undergrounding utility lines. Extraordinary and unique events support the deviations from that program set forth in this decision and Resolution E-3788. 3. SBC provided scant cost justification for its proposed surcharge, and key elements of the proposal are the recording of actual costs and balancing account recovery to ensure SBC full recovery of all recorded costs. 4. SBC proposed virtually no oversight on its cost records. 5. The historic undergrounding cost ratio between SBC and SDG&E provides a reasonable standard against which to initially assess the validity of SBC’s costs. To the extent SBC’s costs exceed 23% of SDG&E’s, enhanced oversight is required. 6. SBC provided no analysis of the number of lines or customers that might be exempt from the proposed surcharge pursuant to contractual terms. 7. Long-standing Commission precedent exempts Lifeline service from public policy surcharges. 8. Competitive local carriers calculate and collect numerous public policy surcharges. 9. The Commission’s typical rate design for public policy surcharges is a percentage of intrastate revenue. Conclusions of Law 1. SBC bears the burden of proving that its proposed surcharge is justified. 2. SBC did not justify its proposal to exclude from the surcharge customers that take service pursuant to Local Wholesale Complete, Individual Case Basis, Express, and Government contracts. The City of San Diego Surcharge for Underground Conversion Costs should modified to apply to all City customers, excluding Lifeline service. 3. So long as SBC’s costs do not exceed 23% of SDG&E’s costs for particular areas, SBC should be required to submit a semi-annual report to the Telecommunications Division Director showing the status of the project, items The surcharge shall be recalculated annually via advice letter filing, with supporting workpapers. 4. If SBC’s San Diego undergrounding costs exceed 23% of SDG&E’s costs in a particular semi-annual report, the Director of the Telecommunications Division shall investigate the cause. Unless the amount by which the 23% has been exceeded is: 1) immaterial or 2) readily explained by easily verified facts, the Director of the Telecommunications Division shall conduct an audit of SBC’s balancing account either using Commission staff or outside vendors. The audit will be funded by SBC, with the total costs of the audit not to exceed 1% of total costs proposed to be recorded in the balancing account that year. Until the cost allocation issues have been resolved, no changes will be made in the surcharge. 5. SBC has not justified its proposed flat fee rate design. The City of San Diego Surcharge for Underground Conversion Costs should be modified to use a percentage of intrastate revenue rather than a flat fee. 6. SBC has not justified its proposal to subject Lifeline service to the City of San Diego Surcharge for Underground Conversion Costs. SBC’s proposed surcharge should be modified to exclude Lifeline service from the surcharge. 7. As modified, SBC’s proposed City of San Diego Surcharge for Underground Conversion Costs should be adopted. 8. This decision should be effective immediately. O R D E R 1. The application of Pacific Bell Telephone Company, known as SBC California (SBC) when this application was filed but now known as AT&T California, Inc., for a balancing account for costs associated with undergrouding aerial telephone facilities in San Diego pursuant to the City of San Diego Underground Utilities Procedural Ordinance and the San Diego Surcharge for Underground Conversion Costs (Surcharge) for the assessment of those costs to San Diego customers, is granted subject to the limitations set forth herein. 2. All local telephone customers in San Diego, including SBC customers that take service pursuant to Local Wholesale Complete, Individual Case Basis, Express, and Government contracts, shall be subject to the Surcharge. Local telephone customers that receive service from competitive local exchange carriers are also subject to the Surcharge. Lifeline service from any provider is, exempt from the Surcharge, but any other intrastate services provided to the Lifeline customer is subject to the Surcharge. 3. SBC shall submit a semi-annual report to the Director of the Telecommunications Division showing the status of the undergrounding project, items recorded in the balancing account, and Surcharge calculations. Supporting detail must also be provided as required. SBC’s semi-annual reports should be filed contemporaneously with San Diego Gas & Electric’s (SDG&E) similar reports to the Energy Division. Each SBC report shall show the fractional relationship between SBC’s and SDG&E’s costs for the lines included in the report. 4. The Surcharge shall be assessed as a percentage of intrastate revenue and separately stated on each customer bill. The Surcharge shall be recalculated 5. If SBC’s San Diego undergrounding costs exceed 23% of SDG&E’s costs in a particular semi-annual report, the Executive Director shall investigate the cause. Unless the amount by which the 23% has been exceeded is: 1) immaterial or 2) readily explained by easily verified facts, the Executive Director shall conduct an audit of SBC’s balancing account either using Commission staff or outside vendors. The audit will be funded by SBC, with the total costs of the audit not to exceed 1% of total costs proposed to be recorded in the balancing account that year. Until the undergrounding cost allocation issues have been resolved, no changes will be made in the surcharge. This order is effective today. Dated ____________________, at San Francisco, California. A.05-03-005 ALJ/MAB/tcg INFORMATION REGARDING SERVICE I have provided notification of filing to the electronic mail addresses on the attached service list. Upon confirmation of this document’s acceptance for filing, I will cause a Notice of Availability of the filed document to be served upon the service list to this proceeding by U.S. mail. The service list I will use to serve the Notice of Availability of the filed document is current as of today’s date. Dated October 30, 2006, at San Francisco, California. /s/ TERESITA C. GALLARDO Teresita C. Gallardo ************ SERVICE LIST *********** Last Update on 25-JUL-2006 by: LIL A0503005 LIST - 1 - ************ APPEARANCES ************ David J. Miller Attorney At Law AT&T CALIFORNIA 525 MARKET STREET SAN FRANCISCO CA 94105 (415) 778-1393 davidjmiller@att.com For: AT&T Mary M. Adu Legal Division RM. 4107 505 VAN NESS AVE San Francisco CA 94102 3298 (415) 703-1952 mma@cpuc.ca.gov Sarah De Young CALIFORNIA ASSOCIATION OF COMPETITIVE 50 CALIFORNIA STREET, SUITE 1500 SAN FRANCISCO CA 94111 (925) 465-4396 deyoung@caltel.org For: CALTEL Glenn Semow LESLA LETHONEN CALIFORNIA CABLE & TELECOMM. ASSOC. 360 22ND STREET, STE. 750 OAKLAND CA 94612 (510) 628-8043 grs@calcable.org For: California Cable and Telecommunications Assoc. John Clark Attorney At Law GOODIN MACBRIDE SQUERI RITCHIE & DAY LLP 505 SANSOME STREET, 9TH FLOOR SAN FRANCISCO CA 94111 (415) 765-8443 jclark@gmssr.com For: Telscape Communications, Inc. Earl Nicholas Selby Attorney At Law LAW OFFICES OF EARL NICHOLAS SELBY 418 FLORENCE STREET PALO ALTO CA 94301 (650) 323-0990 ens@loens.com For: XO Communications Services, Inc. David Discher Attorney At Law PACIFIC BELL TELEPHONE COMPANY 525 MARKET STREET, RM. 2027 SAN FRANCISCO CA 94105 (415) 778-1464 david.discher@att.com For: SBC Thomas Zeleny Attorney At Law SAN DIEGO CITY ATTORNEYS OFFICE 1200 THIRD AVENUE, SUITE 1100 SAN DIEGO CA 92101 (619) 533-5800 tzeleny@sandiego.gov For: City of San Diego Lori Ortenstone Attorney At Law SBC R00M 1300 101 W. BROADWAY SAN DIEGO CA 92101 (619) 237-3329 lori.ortenstone@att.com For: SBC Pamela B. Baterina Associate Director-Regulatory SBC CALIFORNIA 525 MARKET ST., 19/F - 13 SAN FRANCISCO CA 94105 For: SBC California Michael Shames Attorney At Law UTILITY CONSUMERS' ACTION NETWORK 3100 FIFTH AVENUE, SUITE B SAN DIEGO CA 92103 (619) 696-6966 mshames@ucan.org For: UCAN ********** STATE EMPLOYEE *********** Maribeth A. Bushey Administrative Law Judge Division RM. 5018 505 VAN NESS AVE San Francisco CA 94102 3298 (415) 703-3362 mab@cpuc.ca.gov ************ SERVICE LIST *********** Last Update on 25-JUL-2006 by: LIL A0503005 LIST - 2 - Laurence Chaset Legal Division RM. 5131 505 VAN NESS AVE San Francisco CA 94102 3298 (415) 355-5595 lau@cpuc.ca.gov William Johnston Division of Ratepayer Advocates RM. 4101 505 VAN NESS AVE San Francisco CA 94102 3298 (415) 703-2256 wej@cpuc.ca.gov ********* INFORMATION ONLY ********** Noel D. Allan LABRADOR WORLD, INC. 1183 VAN NUYS STREET SAN DIEGO CA 92109 (858) 488-7882 Sara Steck Myers Attorney At Law LAW OFFICES OF SARA STECK MYERS 122 - 28TH AVENUE SAN FRANCISCO CA 94121 (415) 387-1904 ssmyers@att.net Bob Meijer 9052 GERALDINE PLACE SAN DIEGO CA 92123 (619) 602-7250 rmeijer@sprynet.com Marilyn H. Ash MPOWER COMMUNICATIONS CORP. 175 SULLYS TRAIL, SUITE 300 PITTSFORD NY 14534 (585) 218-8729 mash@mpowercom.com For: MPOWER COMMUNICATIONS CORP. Margaret Tobias Attorney At Law TOBIAS LAW OFFICE 460 PENNSYLVANIA AVE SAN FRANCISCO CA 94107 (415) 641-7833 info@tobiaslo.com Jesus Roman Asst. General Counsel VERIZON MAILCODE CA501LB 112 LAKEVIEW CANYON RD. THOUSAND OAKS CA 91362 (805) 372-6233 jesus.g.roman@verizon.com Jacque Lopez VERIZON CALIFORNIA INC. CA501LB 112 LAKEVIEW CANYON ROAD THOUSAND OAKS CA 91362-3811 (805) 372-6664 jacque.lopez@verizon.com Rex Knowles Regional Vice President XO COMMUNICATIONS SERVICES, INC. 111 EAST BROADWAY, SUITE 1000 SALT LAKE CITY UT 84111 (801) 983-1504 rex.knowles@xo.com ************ SERVICE LIST *********** Last Update on 25-JUL-2006 by: LIL A0503005 LIST
| Attachment | Size |
|---|---|
| Busheyproposeddecision.pdf | 1.26 MB |
Like what you see? Go ahead and show your support! UCAN is a truly independent non-profit watchdog organization, dependent on grassroots donations like yours!
Utility Consumers' Action Network - (619) 696-6966
Terms and Conditions
UCAN.org is made available by the Utility Consumers' Action Network to assist you in becoming what you always knew you could be: a consumer ROCK STAR! We take no corporate money, and are beholden only to you, the consumer. As such, the site is here for educational, advocacy, and empowerment purposes, as well to to give you general information and a general understanding of the law. Just remember this site is NOT here to provide specific legal advice. By using this web site you of course understand that there is no attorney-client relationship between you and the Web Site publisher, UCAN. The Web Site should not be used as a substitute for competent legal advice from a licensed professional attorney in your state.
That said, get to digging on the site, inform yourself, speak your mind, and earn Watchdog Bones! This is YOUR site, and we mean it. So comment on any of the content, discuss the latest issues in the forums, file a complaint on a company with the Fraud Squad, and generally cut loose.
See our Terms of Use, Privacy, and Copyright complaint policies as well as our Content Reuse Policy, Some Rights Reserved. Remember, if you have any questions about copyright law or need legal information regarding intellectual property, the internet, or new technologies, visit our affiliate New Media Rights at www.newmediarights.org. If you are in the San Diego region, you can also can apply to use New Media Rights' multimedia studio and equipment for free.










Post new comment